What we build
Bathrooms.
Small rooms, unforgiving details. Waterproofing is the part you never see.
What goes wrong in a bathroom, and how do you stop it?
Bathrooms fail behind the tile, not on it. Waterproofing, substrate and manufacturer installation requirements decide whether a bathroom lasts twenty years or two. That is the part of the job nobody photographs and everybody pays for eventually.
What the job involves.
Behind the tile first
Substrate and waterproofing to manufacturer installation requirements.
Fixtures and finishes
Shower, vanity, tiling and fittings, set out before work starts.
Priced line by line
Estimated in XactRemodel, so you can see what each item costs.
Bathrooms we have finished.
A few of them, start to finish.



A scope built around what it takes to build it right.
Level 3 Xactimate certified estimatorWe estimate in XactRemodel, a detailed, standardized estimating model from the same software family as Xactimate, though not the same software. It prices labor rates, material costs, taxes, overhead and profit, with localized rates for our area. You get the work priced line by line, not a number on the back of a card.
How long it takes
Most bathrooms run four to six weeks on site. Tile and fixture lead times decide more of that than the building work does, which is why we agree every selection before demolition starts.
Tell us what you want built.
Call 224-850-4663 or schedule a consultation, and we will come and look at the property, at no charge.
